Firm's Sarada Bhavan

We facilitate bringing

Your dream of Luxury living now becomes a reality!

Firm's Sarada Bhavan

FIRM'S SARADA BHAVAN is another land mark property including construction of Stilt plus three floors 6 Premium Residential two bed room apartments with modern amenities. The building will be constructed at Plot No.4, Old Door No.16, New No.36, East Club Road, Shenoy Nagar, Chennai-600030.

STRUCTURE

R.C.C framed structure with Brick/ Solid Block/ Cement Block walls plastered and finished with Two Coats of Cement based Putty, with one coat of primer and two coats of Plastic Emulsion. Ceilings will be plastered and finished with Two Coats of Cement based Putty, with one coat of primer and two coats of Plastic Emulsion.

JOINERY

a. Main door: First Quality Burma Teak both frame and shutters (Panel door) Polished both sides with melamine spray.

b. Other doors: will be deep-moulded compressed wood fibre raised panel doors, strengthened with pre-selected kiln dried rails and stiles, with a grain effect etched in the panel with first quality teak frames, both polished with melamine spray. All door frames will be teak frames. Toilet doors will be painted FRP doors.

c. Windows: All windows will be UPVC windows with 4mm plain glass panels and Bright Bar grills embedded in the wall.

FLOORING

Vitrified Tiles 24” X 24” (Rs.50/- per Sq.ft) plain colours with 4” high skirting for the whole flat.

KITCHEN

Polished Black galaxy granite slab over cooking platform, Franke/NIRALI/ equivalent Stainless steel sink with drain board and plain glazed tiles (10 x 14) upto 2’ height above the platform.

TOILETS

Plain ceramic tile flooring, ceramic printed/ plain tile dado, for about 7’0” height from floor, concealed plumbing arrangements.

SANITARYWARES & FIXTURES

:Parryware Cascade NXT/equivalent wall mounted model White closets provided in all bathrooms.  Half turn foam flow taps and fittings MARC Oriental Series or Equivalent for all toilets. Three in one wall mixture will be provided in attached toilet and two in one wall mixture in the common toilet.

ELECTRICAL

Three phase electric supply connection with a separate Manual Three phase changeover switches inside each flat and wiring will be of copper fire retardant cables concealed in PVC conduits. MINIATURE CIRCUIT BREAKERS & RCCB (Residual Current Circuit Breaker) will be provided and switches will be Modular Type mounted on metal boxes. Provision for A/C in all bedrooms. TV and Telephone points will be provided in Living and all bedrooms.

CHEMICAL EARTHING 

Done for the building by digging 3m deep bores inserted with hot dipped galvanized dual pipes, filled with high conductive and corrosion resistant crystalline mixture and backfill compound around the electrodes.  

WATER SUPPLY

Corporation and borewell water supply in the kitchen, service and bathrooms.

LIFT

A SIXPassenger LIFTwill be provided with VVVF and Auto Rescue Device.

GENERATOR

Standby Generator will be provided.

SPECIAL AMENITIES

Special amenities as per individual requirement at extra cost.

Stilt Floor Plan

https://firmfoundations.in/projects/floorplans/thumbnails/13779394171STILT_FLOOR_PLAN.jpg

First Floor

https://firmfoundations.in/projects/floorplans/thumbnails/13779394309TYPICAL_FLOOR_PLAN.jpg

Plot No.4, Old Door No.16, New No.36,
East Club Road, Shenoy Nagar,
Chennai-600030.

https://firmfoundations.in/projects/location/thumbnails/13779397762Firms_Sarada_Bhavan.jpg
FLOOR FLAT AREA ( IN SQ. FEET) AVAILABILITY
First Floor Flat No.1 1080
First Floor Flat No.2 1080
Second Floor Flat No.1 1080
Second Floor Flat No.2 1080
Third Floor Flat No.1 1080
Third Floor Flat No.2 1080
PAYMENT SCHEDULE
At the time of BOOKING Land cost + Regis Charge + 25% of Construction cost
On completion of BASEMENT 10% of Construction cost + Corpus
On completion of GROUND FLOOR ROOF 10% of Construction cost
On completion of FIRST FLOOR ROOF 10% of Construction cost
On completion of SECOND FLOOR ROOF 10% of Construction cost
On completion of THIRD FLOOR ROOF 10% of Construction cost
On completion of BRICK WORK of your flat 10% of Construction cost
On completion of INTERNAL PLASTERING of your flat 7% of Construction cost
On completion of TILE LAYING of your flat 5% of Construction cost
On HANDING OVER POSSESSION 3% of Construction cost

FIRM FOUNDATIONS & HOUSING (P) LTD.

Q-BLOCK, NO.93, 4th MAIN ROAD,
ANNA NAGAR, CHENNAI – 40.

044 2619 2619 ( 4 Lines )

+91 99400 22619 / +91 97909 22619

mail@firmfoundations.in

Other Completed Projects


Chat with us