STRUCTURE
R.C.C framed structure with Brick/ Solid Block/ Cement Block walls plastered and finished with Two Coats of Cement based Putty, with one coat of primer and two coats of Asian Royale Emulsion. Ceilings will be plastered and finished with Two Coats of Cement based Putty, with one coat of primer and two coats of Plastic Emulsion.
JOINERY
a. Main door: First Quality Burma Teak both frame and shutters (Panel door) Polished both sides with melamine spray.
b. Other doors: will be deep-moulded compressed wood fibre raised panel doors, strengthened with pre-selected kiln dried rails and stiles, with a grain effect etched in the panel with first quality teak frames, both polished with melamine spray. All door frames will be teak frames. Toilet doors will be painted FRP doors.
c. Windows: All windows will be UPVC with 5mm plain glazed shutters and Bright Bar grills embedded to the walls.
d. Ventilator:Toilet ventilators will be with aluminium adjustable louvers with inbuilt provision for exhaust fan.
FLOORING
Vitrified tile flooring (24” x 24” @ Rs.60/Sft) from Nitco/ Asian/ Oreva/ Equivalent plain colours for the whole flat (except toilets and service area) with 4” high skirting.
KITCHEN
Polished Black galaxy granite slab over cooking platform, Franke/NIRALI/ equivalent Stainless steel sink with drain board and plain glazed tiles (10 x 14) upto 2’ height above the platform.
TOILETS
Plain ceramic tile flooring, ceramic printed/ plain tile dado, for about 7’0” height from floor, concealed plumbing arrangements. Parryware Cascade NXT/equivalent wall mounted model White closets provided in all bathrooms. Half turn foam flow taps and fittings MARC or Equivalent for all toilets. Each toilet shall be provided with one water closet, one wash basin, one divertor, One tipton and shower rose, one health faucet, pillar cock & angle valve for wash basin and 20 mm concealed stop cock. A towel rod and 12”glass corner soap tray will be provided in each toilet.
ELECTRICAL
Three phase electric supply connection with a separate Manual Three phase changeover switches inside each flat and wiring will be of copper fire retardant cables concealed in PVC conduits. MINIATURE CIRCUIT BREAKERS & RCCB (Residual Current Circuit Breaker) will be provided Switches will be Modular Type mounted on metal boxes from MK INDIA Blendz/ EQUIVALENT. Provision for Split A/C in all bedrooms and living room. TV and Telephone points will be provided in Living and all bedrooms.
CHEMICAL EARTHING
Done for the building by digging 3m deep bores inserted with hot dipped galvanized dual pipes, filled with high conductive and corrosion resistant crystalline mixture and backfill compound around the electrodes.
WATER SUPPLY
Corporation and borewell water supply in the kitchen, service and bathrooms.
LIFT
A SIXPassenger LIFTwill be provided from EMPEROR/KONE/ OTIS or equivalent
GENERATOR
Standby Generator with alternator, sound proof enclosure, control panel, change over panel and earthing etc., will be provided to support the lift, common area lights, motors, and lights & fan points inside the flats.
ORNAMENTAL CORNER MOULDS
will be fitted at Living cum dining ceiling corner areas.
VIDEO DOOR PHONE
For each individual apartment will be provided
Special weathering proof tiles (Insulla) will be laid on the mother terrace to reduce the heat on the top floor.
SPECIAL AMENITIES
Special amenities as per individual requirement at extra cost.
FLOOR | FLAT | AREA ( IN SQ. FEET) | AVAILABILITY |
---|---|---|---|
First Floor | Flat No.1 | 1775 | |
First Floor | Flat No.2 | 1000 | |
Second Floor | Flat No.1 | 1775 | |
Second Floor | Flat No.2 | 1000 | |
Third Floor | Flat No.1 | 1775 | |
Third Floor | Flat No.2 | 1000 |
PAYMENT SCHEDULE | |
---|---|
At the time of BOOKING | Land cost + Regis Charge + 25% of Construction cost |
On completion of BASEMENT | 10% of Construction cost + Corpus |
On completion of GROUND FLOOR ROOF | 10% of Construction cost |
On completion of FIRST FLOOR ROOF | 10% of Construction cost |
On completion of SECOND FLOOR ROOF | 10% of Construction cost |
On completion of THIRD FLOOR ROOF | 10% of Construction cost |
On completion of BRICK WORK of your flat | 10% of Construction cost |
On completion of INTERNAL PLASTERING of your flat | 7% of Construction cost |
On completion of TILE LAYING of your flat | 5% of Construction cost |
On HANDING OVER POSSESSION | 3% of Construction cost |
Q-BLOCK, NO.93, 4th MAIN ROAD,
ANNA NAGAR, CHENNAI – 40.
044 2619 2619 ( 4 Lines )
+91 99400 22619 / +91 97909 22619