SPECIFICATIONS
1.STRUCTURE:
R.C.C framed structure with Brick/ Fly ash walls plastered and finished with Two Coats of Cement based Putty, with one coat of primer and two coats of Asian Premium Emulsion. Ceiling surfaces of the apartments will be given one coat of cement paint on the RCC surface and 12mm gypsum bond false ceiling with galvanized iron section supports. Joint will be taped with touchup putty and finished with one coat of primer and two coats of White colour Premium Emulsion.
2.FLOORING:
Flooring for the Living/ Dining/ Bedroom/ Kitchen area will be laid with 4’x2’ KAJARIA / SOMANY/ Equivalent @ Rs.100/Sft. Vitrified tile flooring 24” x 24” (@Rs.50/- per s.ft) from KAJARIA/ SOMANY/ Equivalent plain colours, for the balconies and passages with 4” high skirting.
3.KITCHEN:
Black galaxy granite slab (18 mm thickness) will be provided above the RCC slab with Nirali/ equivalent make Stainless Steel sink (36”x20”) with drain board. 24” x 12” or 12” x 18” (@Rs.50/Sft) plain colour glazed tiles of KAJARIA/ SOMANY to a height of 3’ above platform will be provided.
4. TOILETS:
Concealed plumbing work shall be done with CPVC pipes and open plumbing lines will be UPVC pipes. Designer toilets with duo- coloured ceramic tiles and glazed tile dado uptoFalse ceiling height for the walls. Tile sizes will be 12” x 18”/ 12’ x 24” from KAJARIA/ SOMANY/ EQUIVALENT (@Rs.50/Sft.)Plain ceramic antiskid tile flooring of size 12” x 12” (@Rs.40/Sft) from KAJARIA/ SOMANY/ EQUIVALENT will be provided.
5. CARPENTRY:
Main door:
Other doors:
Windows:
Ventilator:
Toilet ventilators will be with adjustable louvers / inbuilt provision for exhaust fan. Size will be 2’0”x2’0”
6. ELECTRICAL :
Three phase electric supply connection with a separate Manual Three phase changeover switches inside each flat and wiring will be of copper fire retardant cables concealed in PVC conduits. MINIATURE CIRCUIT BREAKERS & RCCB (Residual Current Circuit Breaker) will be provided Switches will be Modular Type mounted on metal boxes from Legrand/ EQUIVALENT. Provision for Split A/C in all bedrooms and living room. TV points will be provided in Living and master bedroom. Telephone points will be provided in Living and all bedrooms. Invertor will be provided in the apartment.
7. SANITARY AND PLUMBING
Toilet concealed plumbing line and fittings will be CPVC (Chlorinated Polyvinyl Chloride) and external water line pipes and fittings will be UPVC (Un Plasticized Poly Vinyl Chloride) All ceramic wares shall be white in colour (JAQUAR/ TOTO/ Equivalent). Wall mounted closet with concealed tanks provided in all toilets with health faucets. Taps and other fittings – JAQUAR/ EQUIVALENT make CP fittings or equivalent. Each toilet shall be provided with one water closet, one wash basin, one divertor, One tipton (spout with telephonic shower) and shower rose (overhead shower), one health faucet, pillar cock & angle valve for wash basin and 20 mm concealed stop cock. Kitchen sink will be provided with 2 nos Swan Neck (extended neck) wall mounted sink cock.Kitchen service will be provided with 2 nos bib cock.
8. ANTI TERMITE TREATMENT:
Anti-Termite treatment will be done at Footing, Basement, Brick work, Before Plastering and before laying Paving blocks.
9.WEATHERING COURSE
1’0” waterproofing treatment done in the joint between terrace floor slab and parapet wall and this portion is packed with chips to safeguard the waterproof.
Terrace RCC surface will be thoroughly cleaned and baby chips screed will be laid form required slope. Cement mortar with ad mixture will be laid to fix the thermal insulation tile with spacers. The space between the tile will be grouted with water proofing compound. . INSULLA TILE will be provided in terracefloor over Grano flooring by using 5 mm thick chips.
10. LANDSCAPING
Abundant landscaping and green cover will be provided around the building
11. LIFT
A Six passenger Auto door SS Lift from EMPEROR will be provided. Lift license will be procured.
12.COMMON POINTS
FLOOR | FLAT | AREA ( IN SQ. FEET) | AVAILABILITY |
---|---|---|---|
First Floor | First Floor | 1483 | |
Second Floor | Second Floor | 1483 | |
Thir Floor | Third Floor | 1483 |
PAYMENT SCHEDULE | |
---|---|
At the time of BOOKING | 20% |
Before REGISTRATION | 10% |
On completion of FOUNDATION | 12% |
On completion of GROUND FLOOR ROOF | 10% |
On completion of FIRST FLOOR ROOF | 10% |
On completion of SECOND FLOOR ROOF | 10% |
On completion of THIRD FLOOR ROOF | 10% |
On completion of BRICK WORK of your flat | 7% |
On completion of TILE LAYING of your flat | 4% |
On HANDING OVER POSSESSION | 2% |
On HANDING OVER POSSESSION | 2% |
Q-BLOCK, NO.93, 4th MAIN ROAD,
ANNA NAGAR, CHENNAI – 40.
044 2619 2619 ( 4 Lines )
+91 99400 22619 / +91 97909 22619