Firm's Sai Nivas

We facilitate bringing

Your dream of Luxury living now becomes a reality!

Firm's Sai Nivas

FIRM'S Sai Nivas is another property including construction of Stilt plus three floors Premium Residential apartments with modern amenities. The building will be constructed at No. 5/3, TEMPLE ROAD, 1ST CROSS, STREET, JAWAHAR NAGAR, CHENNAI- 600082

Specifications

1. STRUCTURE: R.C.C framed structure with Brick/ Solid Block/ Cement Block walls plastered and finished with Two Coats of Cement based Putty, with one coat of primer and two coats of Asian Premium Emulsion/Equivalent. Ceiling surfaces inside the apartments will be given one coat of cement paint on the RCC surface and 12mm gypsum board false ceiling with galvinised iron section supports. Joints will be taped with touchup putty and finished with one coat of primer and two coats of White colour Premium Emulsion.
 
2  JOINERY:
a. Main door: First Quality African Teak both frame and shutters (Panel door) Polished both sides with melamine spray.
b. Other doors: will be deep-moulded compressed wood fibre raised panel doors, strengthened with pre-selected kiln dried rails and stiles, with a grain effect etched in the panel with first quality teak frames, painted on both sides. All door frames will be country wood frames with painting. Toilet doors will be prepainted ABS doors.
c. Windows: All windows will be UPVC windows, with 5mm glazed shutters and Bright Bar grills embedded in the wall.
d. Ventilator: Toilet ventilators will be with aluminium adjustable louvers with inbuilt provision for exhaust fan.
 
3. FLOORING: Vitrified tile flooring 2 x 2 from Kajaria/Somany/Nitco/Equivalent plain colours @ Rs.60/Sft, for Living/ Dining, all bedrooms, kitchen, balconies and passages with 4” high skirting.
 
4. KITCHEN: Polished Black galaxy granite slab over cooking platform, NIRALI/ equivalent Stainless steel sink with drain board and plain glazed tiles (10 x 16) upto 2' height above the platform. 
 
5. TOILETS: Plain ceramic tile flooring, ceramic printed/ plain tile dado upto 7' feet height  from floor, concealed plumbing arrangements.
 
6. SANITARYWARES & FIXTURES: JAQUAR/PARRYWARE/ equivalent wall mounted model White closets with exposed tank provided in all bathrooms. Half turn foam flow taps and fittings JAQUAR or Equivalent for all toilets. Each toilet shall be provided with one water closet, one wash basin, one wall mixer, shower rose, one health faucet, pillar cock & angle valve for wash basin. 
 
7. ELECTRICAL: Three phase electric supply connection with a separate Manual Three phase changeover switches inside each flat and wiring will be of copper fire retardant cables concealed in PVC conduits. MINIATURE CIRCUIT BREAKERS & RCCB (Residual Current Circuit Breaker) will be provided and switches will be Modular Type mounted on metal boxes from LEGRAND/ EQUIVALENT. Provision for A/C in all bedrooms.
 
8. CHEMICAL EARTHING done for the building by digging 3m deep bores inserted with hot dipped galvanized dual pipes, filled with high conductive and corrosion resistant crystalline mixture and backfill compound around the electrodes. 
 
9. WATER SUPPLY: Corporation and borewell water supply in the kitchen, service and bathrooms. 
 
10.LIFT: ASIX Passenger AUTO DOORLIFT will be provided from EMPEROR/ Equivalent.
 
11. GENERATOR: Standby Generator with alternator, sound proof enclosure, control panel, change over panel and earthing etc., will be provided to support the lift, common area lights, motors, and only lights & fan points inside the flats.
 
12. Special weather proofing treatment will be done to the mother terrace to reduce the heat on the top floor.  

 

Typical Floor Plan

https://firmfoundations.in/projects/floorplans/thumbnails/16557252980Sai_Nivas_Plan.jpg
Will Be Updated Soon...
FLOOR FLAT AREA ( IN SQ. FEET) AVAILABILITY
First Floor Flat A 1165
First Floor Flat B 1165
Second Floor Flat A 1165
Second Floor Flat B 1165
Third Floor Flat A 1165
Third Floor Flat B 1165
PAYMENT SCHEDULE
At the time of BOOKING 20%
On completion of BASEMENT 15%
On completion of GROUND FLOOR ROOF 9%
On completion of FIRST FLOOR ROOF 9%
On completion of SECOND FLOOR ROOF 9%
On completion of THIRD FLOOR ROOF 9%
On completion of BRICK WORK of your flat 9%
On completion of INTERNAL PLASTERING in your flat 9%
On completion of TILE LAYING in your flat 8%
On HANDING OVER POSSESSION 3%

FIRM FOUNDATIONS & HOUSING (P) LTD.

Q-BLOCK, NO.93, 4th MAIN ROAD,
ANNA NAGAR, CHENNAI – 40.

044 2619 2619 ( 4 Lines )

+91 99400 22619 / +91 97909 22619

mail@firmfoundations.in

Other Completed Projects


Chat with us