Firm's Lakshan

We facilitate bringing

Your dream of Luxury living now becomes a reality!

Firm's Lakshan

FIRM'S LAKSHAN is another land mark property including construction of Stilt plus three floors 6 Premium Residential three bed room apartments with modern amenities. The building will be constructed at Plot Old No.4, New No.6, North Avenue, Sri Nagar Colony, Saidapet, Chennai-600015

STRUCTURE
R.C.C framed structure with Brick walls plastered and finished with Two Coats of Cement based Emulsion Putty, with one coat of primer and two coats of Plastic Emulsion. Ceilings will be plastered and finished with Two Coats of Cement based Emulsion Putty, with one coat of primer and two coats of Plastic Emulsion.

JOINERY

a. Main Door: First Quality Burma Teak both frame and shutters (Panel door) Polished both sides with melamine spray.

b. Other Doors: will be deep-moulded compressed wood fibre raised panel doors, strengthened with pre-selected kiln dried rails and stiles, with a grain effect etched in the panel with first quality teak frames, both polished with melamine spray. Toilet doors will be painted FRP doors. All door frames will be teak frames.

c. Windows: All windows will be painted teak wood windows with glass panels (pinhead glass) and Bright Bar grills.

FLOORING

Vitrified Tiles 24” X 24” (Rs.50/- per Sq.ft) plain colours with 4” high skirting for the whole flat.

KITCHEN

Polished Black galaxy granite slab over cooking platform, Franke/NIRALI/ equivalent Stainless steel sink with drain board and plain glazed tiles (10 x 14) upto 2’ height above the platform.

TOILETS

Plain ceramic tile flooring, ceramic printed/plain tile dado, for about 7’0” height from floor, concealed plumbing arrangements.

SANITARYWARES & FIXTURES

Parryware Cascade wall mounted model White closets provided in all bathrooms.  Half turn foam flow taps and fittings MARC or Equivalent for all toilets. Three in one wall mixture will be provided in attached toilet and two in one wall mixture in the common toilet.

ELECTRICAL

Three phase electric supply connection with a separate Manual Three phase changeover switches inside each flat and wiring will be of copper fire retardant cables concealed in PVC conduits. MINIATURE CIRCUIT BREAKERS & RCCB (Residual Current Circuit Breaker) will be provided and switches will be Modular Type mounted on metal boxes. In all bedrooms, provision for A/C  points will be done. TV and Telephone points will be provided in Living and all bedrooms.

CHEMICAL EARTHING

Done for the building by digging 3m deep bores inserted with hot dipped galvanized dual pipes, filled with high conductive and corrosion resistant crystalline mixture and backfill compound around the electrodes.

WATER SUPPLY

Corporation and borewell water supply in the kitchen, service and bathrooms.

LIFT
A FIVEPassenger LIFTwill be provided with VVVF and Auto Rescue Device.

GENERATOR

40 KVA standby Generator with alternator, sound proof enclosure, control panel, change over panel and earthing etc.,will be provided.

ORNAMENTAL CORNER MOULDS

will be fitted at Living cum dining ceiling corner areas.

SECURITY INTERCOM will be provided.

SPECIAL AMENITIES

Special amenities as per individual requirement at extra cost.

Stilt Plan

https://firmfoundations.in/projects/floorplans/thumbnails/13712348019STILT_FLOOR.jpg

First Floor

https://firmfoundations.in/projects/floorplans/thumbnails/13712348195TYPICAL_FLOORl.jpg
Will Be Updated Soon...
FLOOR FLAT AREA ( IN SQ. FEET) AVAILABILITY
First Floor Flat No.1 1700
First Floor Flat No.2 1700
Second Floor Flat No.1 1700
Second Floor Flat No.2 1700
Third Floor Flat No.1 1700
Third Floor Flat No.2 1700
PAYMENT SCHEDULE
At the time of BOOKING Land cost + Regis Charge + 30% of Construction cost
On completion of BASEMENT 10% of Construction cost + Corpus
On completion of GROUND FLOOR ROOF 10% of Construction cost
On completion of FIRST FLOOR ROOF 10% of Construction cost
On completion of SECOND FLOOR ROOF 10% of Construction cost
On completion of THIRD FLOOR ROOF 10% of Construction cost
On completion of BRICK WORK of your flat 7% of Construction cost
On completion of INTERNAL PLASTERING of your flat 5% of Construction cost
On completion of TILE LAYING of your flat 5% of Construction cost
On HANDING OVER POSSESSION 3% of Construction cost

FIRM FOUNDATIONS & HOUSING (P) LTD.

Q-BLOCK, NO.93, 4th MAIN ROAD,
ANNA NAGAR, CHENNAI – 40.

044 2619 2619 ( 4 Lines )

+91 99400 22619 / +91 97909 22619

mail@firmfoundations.in

Other Completed Projects


Chat with us