SPECIFICATIONS:
1. STRUCTURE:
R.C.C framed structure with Brick/ cement blocks walls plastered and finished with Two Coats of Cement based Putty, with one coat of primer and two coats of Asian Premium Emulsion. Ceiling surfaces of the apartments will be given one coat of cement paint on the RCC surface and 12mm gypsum board false ceiling with galvanized iron section supports. Joints will be taped with touchup putty and finished with one coat of primer and two coats of White colour Asian Premium Emulsion.
2. FLOORING:
Flooring for the Living/ Dining area alone will be laid with Kajaria/Somany/ 4x2
tiles @ Rs.100/Sft (light colour). Vitrified tile flooring 2’ x 2’ (@Rs.50/- per s.ft from
Kajaria/ Somany plain colours, for the rest of the flat (bedrooms, kitchen, balconies and
passages) with 4” high skirting.
3. KITCHEN
RCC slab with Black galaxy graniteslab (18 mm Thickness) over cooking platform, with
Nirali make Stainless Steel sink (36”x20”) and drain board. 12” x 18” or 12”x 16”
(@Rs.50/- Sft plain colour glazed tiles of KAJARIA/ SOMANY/ SONARA to a height of 2’
above platform will be provided. Shelves with Black Granite slabs will be provided in the
Kitchen. Electrical points for mixie, grinder, microwave, electric chimney, washing
machine, fridge, and exhaust fan will be provided.
4. TOILETS:
Designer toilets with duo- coloured ceramic tiles and glazed tile dado upto roof height for
the walls. Tile sizes will be 12” x 18”/ 12’ x 24”from KAJARIA/ SOMANY@Rs.50/Sft.
Plain ceramic antiskid tile flooring of size 12” x 12” (@ Rs.40/Sft) from KAJARIA/
SOMANY will be provided. A towel rod and 12” glass corner soap tray will be provided in
each toilet.
5. JOINERY
a. Main door: First Quality AfricanTeak both frame and shutters (Panel door) Polished both sides with melamine spray.
b. Other doors: will be deep-moulded compressed wood fibre raised panel doors, strengthened with pre-selected kiln dried rails and stiles, with a grain effect etched in the panel with first quality teak frames, painted on both sides.Toilet Doors will be Kassa smart ABS pre painted doors.
c. Windows: All windows will be of UPVC (Un plasticized Poly vinyl chloride) with 5mm glass panels and required accessories for locking with Bright bar grills embedded in the wall.
d. Ventilator: Toilet ventilators will be with UPVC louvers with inbuilt provision for exhaust fan.
Godrej Locks will be provided for all bedroom doors and main door.
6.One RCC loftwill be provided in each bedroom and Kitchen.
7. ELECTRICAL :
Three phase electric supply connection with a separate Manual Three phase
changeoverswitches inside each flat and wiring will be of copper fire retardant cables
concealed in PVC conduits. MINIATURE CIRCUIT BREAKERS &RCCB will be
provided and switches will be Legrand model mounted on metal boxes. Split A/C
provision in all bedrooms and living room. TV points will be provided in the living room
and all bedrooms and Telephone points will be provided in Living and all bedrooms.
8. SANITARY AND PLUMBING
Toilet concealed plumbing lines and fittings will be CPVC (Chlorinated Polyvinyl
Chloride) and external water line pipes and fittings will be UPVC (Un Plasticized Poly
Vinyl Chloride Cascade wall mounted NXT closet/ KOHLER /PARRYWARE/ JAQUAR
closets with Concealedtanks provided in all toilets with health faucets. Taps and other
fittings –KOHLER make CP fittings. Each toilet shall be provided with one water closet,
one wash basin, one divertor, shower rose, one health faucet, pillar cock & angle valve
for wash basin and 20 mm concealed stop cock.
9. WATER TANK
Water tank for metro water and borewell water shall be provided, in masonry or RCC.
10. UNDERGROUND SUMP
12000 litres capacity under ground sump shall be constructed for storing metro water.
11. CHEMICAL TREATMENT(Water Proofing treatment)
For toilets and mother terrace.
12. ANTI TERMITE TREATMENTwill be done in the required stages.
13. WEATHERING COURSE
1’0” waterproofing treatment done in the joint between terrace floor slab and parapet
walland this portion is packed with chips to safeguard the waterproof. Proper
weathering care shall be done with grano flooring with INSULLATILES and pointing will
be done with water proofing chemical to reduce heat.
14. LANDSCAPING
Plants will be provided around the building
15. A Six passenger Auto door (V3F) MS Lift from EMPEROR with Auto rescue device will be providedupto Terrace.
16. GENERATOR standby Generator from Kirloskar with alternator, sound proof enclosure, control panel, change over panel and earthing etc., will be provided to support lift, common area lights, Mono bloc and jet pumps and lights and fan points only inside the flats.
17.Access Control systemwith priority cards will be provided.Wooden door at the entrance near staircase will be provided.
18.Provision for piped gas in the ground floor will be provided
19. COMMON POINTS
FLOOR | FLAT | AREA ( IN SQ. FEET) | AVAILABILITY |
---|---|---|---|
First Floor | Flat A | 1535 | |
First Floor | Flat B | 1275 | |
Second Floor | Flat A | 1535 | |
Second Floor | Flat B | 1275 | |
Third Floor | Flat A | 1535 | |
Third Floor | Flat B | 1275 | |
Fourth Floor | Flat A | 1535 | |
Fourth Floor | Flat B | 1275 |
PAYMENT SCHEDULE | |
---|---|
At the time of BOOKING | 15% |
At the time of REGISTRATION | 15% |
On completion of BASEMENT | 15% |
On completion of GROUND FLOOR ROOF | 7% |
On completion of FIRST FLOOR ROOF | 7% |
On completion of SECOND FLOOR ROOF | 7% |
On completion of THIRD FLOOR ROOF | 7% |
On completion of FOURTH FLOOR ROOF | 7% |
On completion of BRICK WORK of your flat | 7% |
On completion of INTERNAL PLASTERING in your flat | 5% |
On completion of TILE LAYING in your flat | 5% |
On HANDING OVER POSSESSION | 3% |
Q-BLOCK, NO.93, 4th MAIN ROAD,
ANNA NAGAR, CHENNAI – 40.
044 2619 2619 ( 4 Lines )